Duration: 3 to 5 days depending on requirements
Objective: At the end of this training, the trainees
should be able to perform some of the routine and special operations related
to Combined-Cycle Power Plant.
Content: Covers changeover of auxiliaries, black
start diesel generator routine test, oil firing operation, on-load over-speed
trip test, load rejection, house-load operation, black-start operation, and
power augmentation.
Target Group: Operation Managers, Operation Engineers,
Shift Engineers, and Plant Operators of combined-cycle power plants.