Plant Name
Configuration
Generating
Capacity (MW)
Generation Type
COD

Lumut Power Plant
(LPP)

6 x 143.3 (GT)
2 x 221.5 (ST)

1,303
CCGT

1996


GB3 (LPP Block 3)


3 x 143.3 (GT)
1 x 221.5 (ST)

651*
CCGT
2003

Prai Power


1 x 230 (GT)
1 x 120 (ST)

350
CCGT
(Single Shaft)
2003

Tanjung Bin Power


3 x 700 (ST)

2,100
Coal Fired
2006**

Total O&M Portfolio

4,404

* 640MW under PPA
** August 2006, first unit
     
   
     
 
   
     
       
       
       
       
       
       
       
       
     
       
 
 
 
 
 
Email Us Attick Multimedia -We Design Almost Everything!