Duration: Maximum of 5 days, depending on requirements

Objective: At the end of this training, trainees should be able to demonstrate an understanding of the maintenance aspects of a steam boiler.

Content: Covers conventional fired-boilers including coal-fired boilers as well as heat recovery steam generators (waste heat boilers) . Scope of training includes maintenance of Boiler Pressure Parts as well as major equipments for boilers such as pulveriser, regenerative air preheater, electrostatic precipitator, flue gas desulfurisation plant etc.

Target Group: Maintenance Managers, Maintenance Engineers, Supervisors as well as other maintenance personnel of combined-cycle and conventional thermal power plants.
     
   
     
 
     
     
     
     
     
     
     
     
   
     
     
       
 
 
 
 
 
Email Us Attick Multimedia -We Design Almost Everything!
Email Us Attick Multimedia -We Design Almost Everything! Download Simulator Training E-Brochure Email Us Attick Multimedia -We Design Almost Everything!