Duration: Maximum of 5 days, depending on requirements

Objective: At the end of this training, trainees should be able to demonstrate an understanding of the maintenance and inspection aspects of a gas turbine.

Content: Covers industrial-type / heavy-framed as well as aero-derivative gas turbines. Scope of training includes maintenance & inspections of gas turbines "hot" parts as well as major gas turbines auxiliaries.

Target Group: Maintenance Managers, Maintenance Engineers, Supervisors as well as other maintenance personnel of gas turbine and combined-cycle power plants.
     
   
     
 
     
     
     
     
     
     
     
   
     
     
     
       
 
 
 
 
 
Email Us Attick Multimedia -We Design Almost Everything!
Email Us Attick Multimedia -We Design Almost Everything! Download Simulator Training E-Brochure Email Us Attick Multimedia -We Design Almost Everything!