Duration: 5 days

Objective: At the end of the course, trainees should be able to demonstrate an understanding of how to efficiently operate a power generating plant.

Content: Covers fundamental of plant efficiency, factors affecting boiler efficiency, operator controllable losses – boiler, factors affecting turbine cycle efficiency, operator controllable losses - turbine.

Target Group: Operation Managers, Operation Engineers, Shift Engineers, Performance Managers, Performance Engineers and Plant Operators of combined-cycle and conventional thermal power plants.
     
   
     
 
     
     
     
     
     
     
   
     
     
     
     
       
 
 
 
 
 
Email Us Attick Multimedia -We Design Almost Everything!
Email Us Attick Multimedia -We Design Almost Everything! Download Simulator Training E-Brochure Email Us Attick Multimedia -We Design Almost Everything!