OPERATION & MAINTENANCE PORTFOLIO
TJSB is currently involved in five Malaysian
projects comprising of three
power stations and two cogeneration facilities
with a combined generating
capacity of 2,600MW.
At present, we are on the eighth contract year for the O&M of the 1,303MW
Lumut
Power Plant.
In 1999, we were also awarded the O&M services contracts for the two
Centralised
Utility Facilities at Kerteh and Gebeng by Petronas Gas Berhad, Malaysia's
national gas company.
In 2000, we secured the O&M services contract for the GB3 Block 3, which
is already in operation. Through our own wholly-owned subsidiary, Natural
Analysis
Sdn Bhd (NASB), another O&M services contract was awarded to TJSB
for the
Prai Power Plant, which started the commercial operation on 20
June 2003.
Table below shows the details of our O&M portfolio in terms of plant
configuration,
capacity, generation type, COD, type of O&M contract and their respective
terms.
Plant |
Configuration |
Capacity (MW) |
Generati- |
COD |
O&M Contract |
O&M Term |
| In Operation | ||||||
| Lumut Power Plant (LPP) | 6x143.3 (gt) 2x221.5 (st) |
1,303 | CCGT | 1996 | Lump Sum | 15 |
| Petronas Gas
Centralised Utilities Facilities (CUF) Gebeng Kerteh |
3x36 (gt) 6x36 (gt) |
108 216 |
COGEN COGEN |
1999 1999 |
Cost Plus Cost Plus |
5 5 |
| GB3/Block 3 | 3x143.3 (gt) 1x221.5 (st) |
651 | OCGT to CCGT | 2001 2003 |
Lump Sum | 21 |
| Prai Power | 1x230 (gt) 1x120 (st) (single-shaft) |
350 | CCGT | 2003 | Lump Sum | 21 |
| Total O&M Portfolio | 2,619 |
TJSB is currently pursuing several O&M contracts with the recently approved
Independent Power Producers (IPP) based in Malaysia.
It is also seeking O&M collaboration or partnership with Malakoff's
subsidiaries
and affiliates engaged in power business. This includes the 2,420MW Sultan
Salahuddin Abdul Aziz Power Station (Kapar Power Station), which is 40% owned
by Malakoff (acquired in July 2000).